Chapman Mills Drive – Median BRT Lanes And Cycle Tracks

This project consisted of the extension of the Bus Rapid Transit Lanes (BRT) down the center median of Chapman Mills Drive from Beatrice Drive to Longfields Drive.

This included the installation of a new stormwater system, as well as cycle tracks on either side of Chapman Mills, red concrete roadway at each intersection and bus platforms with steel faced curbing.